{"id":15237,"date":"2023-02-09T19:44:27","date_gmt":"2023-02-09T19:44:27","guid":{"rendered":"https:\/\/www.thebeast.blog\/?page_id=15237"},"modified":"2024-03-15T13:46:46","modified_gmt":"2024-03-15T13:46:46","slug":"modifications-to-the-basic-dashboard-the-metalwork","status":"publish","type":"page","link":"https:\/\/www.thebeast.blog\/?page_id=15237","title":{"rendered":"Fabricating the new dashboard, the basic metalwork."},"content":{"rendered":"<header class=\"entry-header\"><strong><br \/>\n<\/strong><strong>Our expectations &amp; reasoning behind this.<\/strong>&nbsp;&nbsp;<\/header>\n<header>\n<header class=\"entry-header\">\n<h3><strong>The metalwork (modifications to the basic dashboard).<\/strong><\/h3>\n<p>The better of the two dashboards we have taped up ready to mark out and start cutting.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15095\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-scaled.jpg\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" srcset=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-scaled.jpg 2560w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-300x129.jpg 300w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-1024x439.jpg 1024w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-150x64.jpg 150w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-768x329.jpg 768w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-1536x658.jpg 1536w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-01-2048x877.jpg 2048w\" alt=\"\" width=\"2560\" height=\"1097\"><br \/>\nThe first cut is the lower right-hand switch panel.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15096\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-scaled.jpg\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" srcset=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-scaled.jpg 2560w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-300x163.jpg 300w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-1024x557.jpg 1024w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-150x82.jpg 150w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-768x418.jpg 768w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-1536x836.jpg 1536w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02-2048x1114.jpg 2048w\" alt=\"\" width=\"2560\" height=\"1393\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15097\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-scaled.jpg\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" srcset=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-scaled.jpg 2560w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-300x201.jpg 300w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-1024x687.jpg 1024w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-150x101.jpg 150w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-768x515.jpg 768w, https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-02c-1536x1030.jpg 1536w\" alt=\"\" width=\"2560\" height=\"1717\"><\/p>\n<p>The lower part of the cut and switch housings are taped in position, showing the required extra metal. We will probably use a 5\/3 switch layout instead of the 6\/2 shown.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15098\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-06.jpg\" alt=\"\" width=\"4638\" height=\"3216\"><\/p>\n<p>All the switch housings are in their <em>approximate<\/em> final position.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15099\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-08.jpg\" alt=\"\" width=\"4458\" height=\"2970\"><\/p>\n<p>Steel cutting guide clamped in position ready for the second cut in the repositioning of the head unit and heater controls.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15100\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-10a-.jpg\" alt=\"\" width=\"5184\" height=\"2802\"><\/p>\n<\/header>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15101\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-11.jpg\" alt=\"\" width=\"3888\" height=\"5184\"><\/p>\n<p>The combined single-head unit and heater control plates were removed and are ready to be repositioned.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15102\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-12a.jpg\" alt=\"\" width=\"3463\" height=\"4851\"><\/p>\n<p>The plate with the head unit and heater control recesses was then clamped in position on the second dashboard, to cut out a second plate with head unit recesses&nbsp;<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15103\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-14a.jpg\" alt=\"\" width=\"5184\" height=\"3390\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15104\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-15a.jpg\" alt=\"\" width=\"5184\" height=\"3252\"><\/p>\n<p>The ends were cut with an electric die grinder.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15105\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-16a.jpg\" alt=\"\" width=\"5184\" height=\"2844\"><\/p>\n<p>Recesses plates both de-burred using a piece of angle iron as a support to prevent them from bending.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15106\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-17a.jpg\" alt=\"\" width=\"5184\" height=\"2784\"><\/p>\n<p>Both plates were taped in their <em>approximate<\/em> final position,&nbsp; <em>just to see what they will look like.<\/em><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15107\" src=\"https:\/\/www.thebeast.blog\/wp-content\/uploads\/2023\/01\/Dash-construction-19.jpg\" alt=\"\" width=\"3940\" height=\"3160\"><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong><em><br \/>\n<\/em><\/strong><strong><em><a href=\"https:\/\/www.thebeast.blog\/?page_id=15239\">Recessed storage compartment with lid<\/a>, <\/em><span style=\"color: #99ccff;\"><em>(a bit of CAD work, cardboard-aided design).<\/em><\/span><br \/>\n<em>&nbsp;&nbsp;&nbsp; &nbsp;Fabricating the recessed storage compartment.<\/em><br \/>\n<\/strong><\/p>\n<\/header>\n<div class=\"entry-content\">\n<div class=\"entry-content\">\n<div class=\"entry-content\">\n<p><span style=\"color: #3366ff;\"><strong>More info and photos and a full write-up to follow soon.<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<div class=\"entry-content\">\n<p><strong><em><br \/>\n<\/em>Home build \u2013 <em>Pros.<br \/>\n<\/em><\/strong><em>You should get what you want<\/em><em>.<br \/>\n<\/em><em>It should do what you want<\/em><em>.<\/em><strong><em><br \/>\n<\/em><\/strong><em>A better understanding of what\u2019s there.<\/em><strong><em><br \/>\n<\/em><\/strong><em>Unique,<\/em><span style=\"color: #99ccff;\"><em> (this may be a con for some people).<\/em><\/span><strong><em><br \/>\n<\/em><\/strong><\/p>\n<p><strong><em>Home build \u2013 Cons.<br \/>\n<\/em><\/strong><em>If it\u2019s not what you want it\u2019s your own fault.<\/em><em><br \/>\nIf it doesn\u2019t do what you want it\u2019s your own fault.<br \/>\nQuite a lot of work is involved.<br \/>\n<\/em><em>Unique, not stock so harder to replace<\/em><em>.<\/em><\/p>\n<\/div>\n<h4>Related items.<br \/>\n<span style=\"color: #339966;\">&nbsp;&nbsp; &nbsp; <a style=\"color: #339966;\" href=\"https:\/\/www.thebeast.blog\/?page_id=15091\">The new dashboard.<\/a><\/span><br \/>\n<em><span style=\"color: #339966;\"><strong>&nbsp;&nbsp; &nbsp;<\/strong> <a style=\"color: #339966;\" href=\"https:\/\/www.thebeast.blog\/?page_id=12544\">Stirring column cowl<\/a>, <span style=\"color: #99ccff;\">(see <a style=\"color: #99ccff;\" href=\"https:\/\/www.thebeast.blog\/?page_id=10602\">switch connections<\/a> for more info).<\/span><\/span><\/em><br \/>\n<em><span style=\"color: #339966;\">&nbsp; &nbsp;&nbsp; <a href=\"https:\/\/www.thebeast.blog\/?page_id=14203\">Overhead switch panel<\/a>, <span style=\"color: #99ccff;\">(see <a style=\"color: #99ccff;\" href=\"https:\/\/www.thebeast.blog\/?page_id=10602\">switch connections<\/a> for more info).<\/span><\/span><\/em><\/h4>\n<p><span style=\"color: #3366ff;\"><strong>&nbsp;<\/strong><\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Our expectations &amp; reasoning behind this.&nbsp;&nbsp; The metalwork (modifications to the basic dashboard). The better of the two dashboards we have taped up ready to mark out and start cutting. The first cut is the lower right-hand switch panel. The lower part of the cut and switch housings are taped in position, showing the required &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.thebeast.blog\/?page_id=15237\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Fabricating the new dashboard, the basic metalwork.&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":15091,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-15237","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/pages\/15237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15237"}],"version-history":[{"count":7,"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/pages\/15237\/revisions"}],"predecessor-version":[{"id":17708,"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/pages\/15237\/revisions\/17708"}],"up":[{"embeddable":true,"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=\/wp\/v2\/pages\/15091"}],"wp:attachment":[{"href":"https:\/\/www.thebeast.blog\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}