Our reasoning and expectations behind this.
Items in “grey” are still to-do.
Items in “mauve” need to be fixed, replaced, or upgraded or we need more.
Items in “brown” are under construction.
Items in “green” are almost completed or on order.
Items in “black” completed.
Items in “italics any colour” are listed in another category, (see links).
All the holes in the floor welded/sealed.
Wood flooring.
Hatches to the storage compartment.
Altro Flooring on the plywood, (planned).
Rubber-backed removable carpet.
12v underfloor heating, (mains fed, see long-term protection).
The lightweight plywood flooring has been fitted, & the first of the access hatches cut, another will be cut when the second storage compartment is installed; once this is completed, the whole lot can be permanently fitted in place and covered in Altro Flooring.
Rubber-backed removable carpet/mat cut to size and installed.
More info and Photos and a full write-up to follow soon.
In-use reviews.
Our conclusions.
Pros.
Cons.
Other related or affected items.
Faulty rear heater unit removed.
Under-slung storage and battery boxes.
Extend floor where the fuel tank was, (planned mod after the fuel tank is moved).
Water storage where the old fuel tank was, (accessible from inside the van).