A bit more progres on the Beast.

Hi all.
A bit of progress recently care of Doug and Dan at Dougs VW Werks.
First Dan has extended the back wheel arches so the wheels won’t hit the bodywork if I go over a big lump.
 

Dan has also welded up all the holes in the floor from previous fixing etc.

Fixed the lower door runner.

Tidied up the front wheel arches.

Repaired the front driver’s step.

And most importantly the hole above the jacking point.

This work was followed by a Doug who promptly cut a new hole in the floor to fit an under-slung battery box.

Doug has also repaired the gear linkage and work continues on the wiring at the front and the installation of new dash clocks (hopefully more photos to follow)

At a later date we are planning to fit a second box on the other side (along with a cable gear linkage system) and fuel tanks to the left and right outer sides. more on that when it happens.

See any photo heading links or the reviews section for more info on the above.

.

.